Building Management  Services  News  Tenants Only   Around Town  
Home Page Available Suites FAQ Contact Us  
News
General Registration Form
 
 
 
 
 
 

News
 
Facility Improvements

Date: Tuesday, October 27, 2009
Author: Sondra

As you know, over the next several months the lobby and plaza will be realizing
significant improvements. The design concept is to open up the lobby to the exterior
through changes in the windows, the flooring and the exterior plaza surface. Other
improvements include a new entrance that will be enhanced with an overhead canopy
and lighting, outdoor seating, trees throughout the plaza and the lobby, and
audio-visual components within the lobby.

http://www.1clevelandcenter.com/Media/News/Summer_2009.pdf




Back to News
 
 

Professionally managed By Optima Management Group, LLC  • 1375 East 9th Street Cleveland Ohio 44114 (216) 781.8980
Site designed and hosted by Mango Bay Internet. Reproduction of any part of this site is strictly prohibited.